Greenhouse Gas Emissions Report Verification
Our company has successfully obtained accreditation for verification activities related to the European Union Emissions Trading System (EU ETS) within activity groups 1b and 98. In addition, we have obtained accreditation in the field of verification of environmental information for the verification/validation of reports related to methane emissions reduction and the origin of renewable gases.
Axing is an accredited partner in the verification of greenhouse gas emissions reports, supporting compliance, risk reduction and the secure operation of regulated activities.
Our accreditation and verification activities are based on the following standards and regulations:
- EN ISO 14065:2020 – General principles and requirements for bodies validating and verifying environmental information
- EN ISO 14064-3:2019 – Specification with guidance for the verification and validation of greenhouse gas statements
- EN ISO 17029:2020 – Conformity assessment – General principles and requirements for validation and verification bodies
- Article 10a of Directive 2003/87/EC (EU ETS 98)
- Regulation (EU) 2024/1787 (methane emissions)
- Hungarian Government Decree 215/2024 (VII.29.) (origin of renewable gases)
Areas of Accreditation
Related Documents
NAH Accreditation Certificate
Accreditation certificate number: NAH-10-0011/2026
Validity: 26 March 2026 – 26 March 2031
NAH Detailed Accreditation Annex – List of Activities
Declaration of Impartiality
Complaints and Appeals Handling Procedure
Rules for the Use of References and Trademarks Related to Validation and Verification
Information for Clients Regarding Validation and Verification Activities
Axing Zrt. performs verification/validation activities in accordance with the requirements set out in the applicable standards and regulations. Based on these requirements, certain stages of the verification process require close cooperation between the Client and Axing Zrt. The main steps of the process are as follows:
- Consultation required for the preparation of the quotation and/or contract (clarification of assignment details)
- Activities prior to acceptance of the engagement (capacity, impartiality and competence assessments within Axing Zrt.’s verification organization)
- Finalization of the contract. Based on the detailed information provided, Axing Zrt. performs the strategic analysis and risk assessments.
- Planning required for report verification according to the assignment (verification plan, evidence collection plan, etc.), analysis and verification of data/methodologies/tools
- On-site inspection and interviews
- Issuance of the verification report